Project: Demolition of Finger Pier at 51 Pioneer Sector 1
Description: Demolition of Existing Finger Pier’s Superstructure (RC Slab, Cross and Crane Beam, Top of RC Pile) by Wire Saw Cutting, Floor Saw Cutting, Coring, and Hacking Method